A wind-turbine blade transported by a heavy-haul convoy

INTERNATIONAL CONFERENCE ·DUBAI · 2027

WIND FARM LOGISTICS CONFERENCE

Wind farm transport, heavy lifting and installation — the full delivery chain in one room.

01

The challenge

A WIND FARM
BEGINS WITH
LOGISTICS.

Long before a wind turbine generates power, its blades, nacelles and tower sections must move through ports and borders, across bridges and around bends — all within narrow weather windows.

HEAVY WIND brings together the decision-makers responsible for each interface. The aim is practical: identify constraints earlier, match specialist capacity to projects and develop delivery plans that work from factory gate to final installation.

Follow the logistics chain
01 / Access

Can the cargo get through?

Route surveys, clearances, civil works, permits and escorts.

02 / Capacity

Is the equipment available?

Trailers, cranes, vessels and specialist crews at the right time.

03 / Sequence

Is every interface aligned?

Factory, port, border, road and site working to one execution plan.

02

From factory gate to final installation

THE WHOLE
LOGISTICS CHAIN.

One project schedule. Four operational environments. Dozens of handovers that have to work as a single system.

01

Factory

Component readiness

Production sequencing, cargo release, lifting points and transport design aligned before dispatch.

02

Port

Handling & marshalling

Berth windows, storage plans, vessel interfaces and the handover from vessel discharge to inland haulage.

03

Corridor

Route & borders

Permits, customs, bridge checks, turning radii, escorts and road upgrades across every jurisdiction.

04

Site

Lift & installation

Delivery sequence, crane readiness, weather windows and the final interface with erection teams.

PROJECT LOGISTICS IS NOT JUST A TRANSPORT LEG.

IT SHAPES THE PROJECT.

03

Programme framework

THREE TRACKS.
ONE EXECUTION PLAN.

Built around the decisions that move wind projects from the development pipeline to installed capacity.

01

Markets & projects

Where the next wave of project logistics demand will come from.

  • Regional wind project pipelines
  • Procurement and contracting models
  • Vessel, trailer, crane and specialist capacity
02

Routes & borders

Where project schedules gain certainty or lose time.

  • Route surveys and infrastructure readiness
  • Customs, permits and cross-border compliance
  • Ports, corridors and last-mile access
03

Transport & installation

How components reach the hook in the right sequence.

  • Heavy haulage and lifting systems
  • Crane, vessel and site interfaces
  • Weather, safety and execution planning

Detailed agenda, speakers and case studies will be announced as the 2027 programme is confirmed.

04

Who attends

NOT A CROWD.
THE RIGHT ROOM.

A focused conference for people who own the schedule, the equipment, the route or the risk.

01

Wind farm developers, owners & investors

02

Wind turbine OEMs & component manufacturers

03

EPCs & main contractors

04

Project logistics providers

05

Heavy-haul & heavy-lift operators

06

Ports, terminals, shipowners & charterers

07

Crane, lifting & installation contractors

08

Road authorities, customs & permitting bodies

05

HEAVY WIND · Tashkent · 2023

BUILT WITH
THE INDUSTRY.

100+

delegates at HEAVY WIND Tashkent 2023

View the 2023 archive
06

Dubai · 2027

INTERNATIONAL EDITION

DUBAI
2027.

Conference dates will be announced with the full programme.

HOST CITY

DUBAI
UNITED ARAB EMIRATES

The conference venue will be announced with the 2027 programme.

Register interest

PARTICIPATION

Delegate rates for the 2027 edition.

Sales windows will open when the conference dates are confirmed. Conference-day catering is included.
02 / StandardUSD 899

General registration

03 / FinalUSD 999

Subject to availability

NETWORKING PROGRAMME

A hosted networking evening in Dubai is planned for informal industry conversations after the main programme.

HEAVY WIND · Dubai · 2027

PUT THE FULL
LOGISTICS CHAIN
IN ONE ROOM.